Pilot results

11.5× less time on expiry control. Write-offs −59%.

A two-store pilot in a Ukrainian grocery chain, November 2024. Baseline measured before go-live, result measured after one month of use. The full method is below.

The chain is not named: we publish client names only with written consent.

11.5×
less time on expiry control
18.5 → 1.6 person-days per store per month
−59%
write-offs
across the 8 product groups measured
+0.38%
of turnover
extra sales from markdowns
16,935
tasks in one month
created by Freshto, completed by staff

Pilot in a Ukrainian grocery chain: 2 stores, 3,684 SKUs in 11 categories, November 2024. Baseline measured before go-live, result after one month of use.

Read the pilot results

Context

Format
Grocery chain, two self-service stores
Assortment under control
3,684 SKUs in 11 categories
Go-live
25 October 2024
Baseline
24–25 October 2024, timed on the floor
Result period
11–30 November 2024 (20 days), scaled to a calendar month
Devices
Staff smartphones
Integration
Excel assortment upload, no ERP integration
Implementation effort
30 hours of IT and 80 hours of consultants; 840 hours of continuous service operation

Before the pilot

Expiry control meant walking every shelf, writing dates in a logbook, checking the logbook daily and removing products according to it. We timed it: 68 seconds per product in one store and 26 in the other, for assortments of 4,261 and 2,911 products in the measured groups. With the daily logbook work and removals, that added up to 21.7 and 15.3 person-days a month, 18.5 on average.

Method

  1. 1

    Baseline

    On 24–25 October 2024 we timed the existing routine in both stores (checking a group of 52 products, logbook work, removals) and collected write-off data for the preceding period.

  2. 2

    Setup

    The assortment (3,684 SKUs) was uploaded from Excel. Markdown steps were agreed per category with the chain. Staff entered the nearest date for each product once.

  3. 3

    Live period

    From 11 to 30 November 2024 the stores worked exclusively from the Freshto morning list. Every task was logged with time and employee, which is where the "after" timing comes from.

  4. 4

    Measurement

    Time spent, write-offs and markdown sales were measured for the live period and scaled to a calendar month for comparison with the baseline.

Time on expiry control

BeforeStore 1Store 2
Seconds per product checked6826
Products in measured groups4,2612,911
Shelf checks with logbook entry, min / month3,3172,266
Daily logbook review, min / month900900
Removals according to logbook, min / month1,9441,255
Total, person-days / month21.715.3
After (20 days, scaled to a month)Store 1Store 2
Tasks completed in 20 days1,6651,075
Seconds per task4529
Total, minutes / month1,221348
Total, person-days / month2.50.7

Average: 18.5 → 1.6 person-days per store per month, 11.5× less. Note that a single check did not get faster (45 and 29 seconds per task against 68 and 26 before). The saving comes from checking only the products on the list.

Did the checks find anything?

Before the pilot, a timed check of 52 products in one category found 0 products requiring action and 26 that needed to be watched again. In the pilot month, every one of the 2,740 tasks on the list required an action: a new date, a markdown or a removal.

52
Before: products checked
0
Before: products requiring action
2,740
After: tasks on the list
100%
After: tasks requiring action

Results

BeforeAfterΔ
Time on expiry control18.5 person-days / month1.6 person-days / month11.5× less
Write-offs of expired goods (8 product groups measured)Baseline−59%−59%
Sales of marked-down goodsNot tracked+0.38% of turnover+0.38%
Tasks created and completedLogbook and chat16,935 in a month≈ 68 per store per day
Supplier remindersCalculated by hand394 SKUsautomatic

All numbers: Freshto pilot report, 2 stores, November 2024. Write-offs were measured across 8 product groups (soft drinks, beer, confectionery, snacks, grocery, frozen, bread and eggs, household chemicals). No other performance figures are published.

What we learned

  • Most of the time saving comes from not walking the whole floor: about 68 tasks per store per day replaced full shelf checks.
  • Markdown steps turned products that used to be written off into sales worth 0.38% of turnover.
  • Supplier reminders were an unexpected benefit: 394 SKUs with short remaining shelf life on delivery were reported automatically, a calculation staff used to do in their heads.
  • Initial entry of nearest dates is the one real effort; after that the daily routine is minutes.

Run the same pilot in your chain

Same method, your stores, your numbers. We will plan it with you.